WebCULTEC Recharger 280HD plastic septic chamber - 26.5 in / 673 mm high - for septic leach fields. 1.800.4 ... Products. View All Storm Water Products; Contactor Field Drain C-4HD; Contactor 100HD; Recharger 150XLHD; Recharger 180HD; Recharger 280HD; Recharger 330XLHD; Recharger 360HD; Recharger 902HD; CULTEC Manifold Components; … WebMODEL # 100HD Request Information Download PDF Specifications 1 2 3 4 5 The Contactor ® Chamber series consists of lower profile, lower capacity chambers used for septic installations with depth restrictions or …
CULTEC Manifold Components - CULTEC, Inc.
WebCULTEC, Inc., May 2014 CULTEC Stormwater Installation Instructions CULG012 05-14 5 CULTEC End Detail Information for Recharger® V8HD Model RHD is a stand alone unit with two fully closed endwalls. They are used when a single unit is required. They may be also be trimmed to into model types SHD or EHD. Model EHD is an end unit with one fully Web6. The nominal chamber dimensions of the CULTEC Contactor® 100HD shall be 12.5 inches (318 mm) tall, 36 inches (914 mm) wide and 8 feet (2.44 m) long. The installed length of a joined Contactor® 100HD shall be 7.5 feet (2.29 m). 7. Maximum inlet opening on … follow arc
Contractor Information for CULTEC Systems - CULTEC, …
Web6. ®The nominal chamber dimensions of the CULTEC Contactor 100HD shall be 12.5 inches (318 mm) tall, 36 inches (914 mm) ... when installed in accordance with CULTEC’s installation instructions. 19. The chamber shall be designed to withstand traffic loads when installed according to CULTEC's recommended installation WebRefer to CULTEC’s most current installation instructions for further details including but not limited to acceptable fi ll materials and vehicle loads. Minimum Fill Requirements Table 1 See Fig. 1 Contactor® 100HD Recharger® 150XLHD Recharger® ® 280HD Recharger ® 330XLHD Recharger V8HD Typical Center to Center Spacing G WebThe maintenance of the system would be required of the preliminary collection systems prior to feeding the chamber bed. CULTEC recommends that the pretreatment structures (catch basin with a two foot sump, hooded elbow, large diameter pipe header, inlet protection device, or a pretreatment BMP) be inspected at least once every 2-3 months for any … ehts shop